Commit Graph

21 Commits

Author SHA1 Message Date
Nuwan e35163ec84 docs(27): complete Backing Track Sync phase
- Phase 27 verified: 2/2 must-haves confirmed
- BT-01: openBackingTrack action enables session screen sync
- BT-02: ignore flag prevents unmount warnings
- ROADMAP.md, STATE.md, REQUIREMENTS.md updated

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-26 17:25:08 +05:30
Nuwan 634d86f43b docs(26): complete JamTrack Polish phase
- Phase 26 verified: 4/4 must-haves passed
- Requirements JT-01 through JT-04 complete
- Ready for Phase 27 (Backing Track Sync)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 19:18:41 +05:30
Nuwan eab0b0d19a docs(v1.6): create roadmap for Media Features Polish
- 3 phases: JamTrack Polish, Backing Track Sync, Metronome Responsiveness
- 8 requirements mapped to phases
- Research complete for all features

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 18:51:18 +05:30
Nuwan daaa37a84e chore: complete v1.5 milestone
Archived:
- milestones/v1.5-ROADMAP.md
- milestones/v1.5-REQUIREMENTS.md
- milestones/v1.5-MILESTONE-AUDIT.md

Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md

Updated:
- MILESTONES.md (new entry)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)

v1.5 Fix Session Recording shipped:
- Fixed C++ client crash on Start Recording (JSON parsing)
- Fixed memory leaks in recording modal
- User verified 15+ minute recording stability

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 11:56:26 +05:30
Nuwan fcf68b6926 docs(24): complete Fix Recording Crash phase
- Phase 24 executed and verified
- CRASH-01 through CRASH-04 requirements complete
- Method names corrected: StartMediaRecording → StartRecording, FrontStopRecording → StopRecording
- Parameters unpacked to match legacy signature

Verification: 4/4 must-haves passed

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:26:26 +05:30
Nuwan 1512f646ea docs: start milestone v1.5 Fix Session Recording
Scope:
- Phase 24: Fix C++ client crash on Start Recording
- Phase 25: Verify Start/Stop/Pause work like desktop native app
- Phase 26: Memory leak audit for recording modal

Research findings:
- Missing RegisterRecordingCallbacks call
- Wrong method names (StartMediaRecording vs StartRecording)
- Parameter format mismatch

10 requirements across 3 phases.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:04:30 +05:30
Nuwan 4f74da017f chore: complete v1.4 milestone
Archived:
- milestones/v1.4-ROADMAP.md
- milestones/v1.4-REQUIREMENTS.md

Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md

Updated:
- MILESTONES.md (v1.3 and v1.4 entries)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)

Tagged: v1.4

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-18 18:51:29 +05:30
Nuwan 84e7d50422 docs(23): complete Memory Leak Verification phase
- Phase 23 verified: 6/6 must-haves passed
- User confirmed 15+ minute session stability without freezes
- All Playwright tests pass (14 failures are pre-existing)
- v1.4 Memory Leak Prevention milestone complete

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-10 17:22:54 +05:30
Nuwan 41972973ca docs(22): complete Session Screen Fixes phase
Phase 22 verified: 3/3 must-haves passed (SESS-01, SESS-02, SESS-03)
- SESS-01: Callback cleanup hardened with useRef pattern
- SESS-02: Polling intervals verified OK (Phase 19)
- SESS-03: Event listeners verified OK (Phase 19)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 21:55:15 +05:30
Nuwan 849465c43b docs(21): complete Chat Window Fixes phase 2026-02-08 20:56:30 +05:30
Nuwan d162e6cd89 docs(20): complete VU Meter Fixes phase
- VUMTR-02, VUMTR-03 requirements complete
- VUMTR-01 deferred (performance, not memory leak)
- Verification passed (3/3 must-haves)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 19:32:55 +05:30
Nuwan 5fbb51158f docs: create milestone v1.4 roadmap (5 phases)
Phases:
19. Audit and Discovery: investigate all areas, identify leaks
20. VU Meter Fixes: VUMTR-01, VUMTR-02, VUMTR-03
21. Chat Window Fixes: CHAT-01, CHAT-02, CHAT-03
22. Session Screen Fixes: SESS-01, SESS-02, SESS-03
23. Verification: VRFY-01, VRFY-02

All 11 milestone requirements mapped to phases.
2026-02-08 13:57:58 +05:30
Nuwan 2ae1764176 docs: define milestone v1.4 requirements
11 requirements across 4 categories:
- VU Meters (3): Interval/animation cleanup
- Chat Window (3): WebSocket listener and state cleanup
- Session Screen (3): useEffect and polling cleanup
- Verification (2): Stability and memory monitoring
2026-02-08 13:36:23 +05:30
Nuwan f161573974 docs(18): complete Phase 18 and v1.3 milestone
- Mark INT-01, INT-02, INT-03 requirements as complete
- Update roadmap: Phase 18 complete, v1.3 shipped 2026-02-08
- Add 18-VERIFICATION.md with 3/3 must-haves verified

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 12:49:18 +05:30
Nuwan 58e421d0bc docs(17): complete Unit Tests (Jest) phase
Phase 17 verified:
- UNIT-01: Modal renders with currentSession props ✓
- UNIT-02: Save button calls onSave with correct payload ✓
- UNIT-03: Loading state disables form interactions ✓

9 tests passing in JKSessionSettingsModal.test.js
2026-02-08 12:25:38 +05:30
Nuwan 2c78e39ab8 docs: define milestone v1.3 requirements
6 requirements across 2 categories:
- UNIT-01 through UNIT-03: Jest unit tests
- INT-01 through INT-03: Playwright integration tests
2026-02-08 11:59:55 +05:30
Nuwan 460dd5b4cb chore: complete v1.2 Session Attachments milestone
Archived:
- milestones/v1.2-ROADMAP.md (full phase details)
- milestones/v1.2-REQUIREMENTS.md (all 24 requirements marked complete)

Deleted (fresh for next milestone):
- REQUIREMENTS.md

Updated:
- MILESTONES.md (new entry with stats and accomplishments)
- ROADMAP.md (collapsed v1.2 phases into details tag)
- STATE.md (reset for next milestone)

v1.2 Session Attachments shipped 2026-02-07:
- 5 phases (12-16), 11 plans
- 12 files, 1,868 lines
- 5 days from start to ship

Key features delivered:
- File upload with validation (10 MB, approved types)
- Attachment display in chat with clickable links
- Real-time sync via WebSocket
- Error handling with toast notifications
- Unread badge persistence

Bugs fixed during UAT:
- Attachment message deduplication race condition
- Unread count not persisting across page reloads

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-07 02:19:32 +05:30
Nuwan 8cf0b661a7 docs(15): complete Phase 15 - Real-time Synchronization
Phase 15 verified and complete with bug fixes:
- WebSocket handler extracts attachment fields correctly
- Deduplication works for both WebSocket and REST API paths
- Integration tests created (test/attachments/real-time-sync.spec.ts)
- Human verification passed

Bug fixes applied during UAT:
- Optimistic update for uploader (sender excluded from WebSocket)
- fetchChatHistory dispatch on channel activation
- API field name (chats not messages)
- API parameter name (music_session not session_id)
- Infinite loop prevention in fetch

Known limitation documented:
- WebSocket only broadcasts to musicians (as_musician: true filter)
- Pre-existing backend behavior, not introduced by v1.2

Requirements satisfied: REQ-3.1*, REQ-3.2
* REQ-3.1 has known limitation for non-musician participants

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-06 18:20:44 +05:30
Nuwan 0124977723 docs(14): complete chat-integration-and-display phase
Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-06 01:59:48 +05:30
Nuwan 45e284096a docs(13): complete File Upload Infrastructure phase
- Mark all 3 plans complete (validation, Redux state, UI integration)
- Update phase status: Complete (2026-02-05)
- Mark 8 requirements as Complete (REQ-1.1-1.4, REQ-6.1-6.3, REQ-7.1)
- Phase verification: 14/14 must-haves verified (100%)
- User verified: file upload working end-to-end with backend 201 Created
2026-02-05 19:04:17 +05:30
Nuwan 631253d3f7 docs(roadmap): add v1.2 Session Attachments milestone
Add comprehensive roadmap for file attachment feature:
- Update PROJECT.md with v1.2 milestone and requirements
- Create REQUIREMENTS.md with 24 requirements across 7 categories
- Add Phases 12-16 to ROADMAP.md (5 phases, 10 plans)
- Update STATE.md with milestone v1.2 status

Phases:
- Phase 12: Attachment Research & Backend Validation (2 plans)
- Phase 13: File Upload Infrastructure (3 plans)
- Phase 14: Chat Integration & Display (2 plans)
- Phase 15: Real-time Synchronization (1 plan)
- Phase 16: Attachment Finalization (2 plans)

Coverage: 24/24 requirements mapped (100%)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-02 18:38:34 +05:30