Nuwan
51f7cb105a
docs(v1.6): descope Phase 28 - metronome responsiveness satisfactory
...
Removed Phase 28 (Metronome Responsiveness) from v1.6 milestone.
Metronome responsiveness is satisfactory after Phase 26-27 improvements.
MET-01, MET-02 requirements moved to Out of Scope.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 16:31:17 +05:30
Nuwan
e35163ec84
docs(27): complete Backing Track Sync phase
...
- Phase 27 verified: 2/2 must-haves confirmed
- BT-01: openBackingTrack action enables session screen sync
- BT-02: ignore flag prevents unmount warnings
- ROADMAP.md, STATE.md, REQUIREMENTS.md updated
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-26 17:25:08 +05:30
Nuwan
c7f6480137
docs(27): create phase plan for backing track sync
...
Phase 27: Backing Track Sync
- 1 plan in 1 wave
- 2 tasks (both auto)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-26 16:55:35 +05:30
Nuwan
e4300aecb4
docs(26): complete JamTrack Polish phase with gap closure round 2
2026-02-25 23:51:01 +05:30
Nuwan
6423df4b7b
docs(26): complete JamTrack Polish phase with gap closure
2026-02-25 23:24:34 +05:30
Nuwan
41463c9863
docs(26): create gap closure plan for stems/controls render timing
...
Phase 26: JamTrack Polish
- Plan 26-03 removes 'idle' from valid render states
- Closes UAT gap: stems/controls appearing before sync
- 1 plan in wave 3, depends on 26-02
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 22:59:46 +05:30
Nuwan
634d86f43b
docs(26): complete JamTrack Polish phase
...
- Phase 26 verified: 4/4 must-haves passed
- Requirements JT-01 through JT-04 complete
- Ready for Phase 27 (Backing Track Sync)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 19:18:41 +05:30
Nuwan
48c9bf8313
docs(26): create phase plan for JamTrack Polish
...
Phase 26: JamTrack Polish
- 2 plan(s) in 2 wave(s)
- Wave 1: 26-01 (UI fixes - sizing, navigation)
- Wave 2: 26-02 (state/callback fixes - cleanup, deferred rendering)
- Ready for execution
Requirements covered:
- JT-01: Defer UI rendering until track ready
- JT-02: Fix WindowPortal sizing (460x350)
- JT-03: Implement create custom mix navigation
- JT-04: Add callback cleanup for jamTrackDownload* globals
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 19:05:14 +05:30
Nuwan
eab0b0d19a
docs(v1.6): create roadmap for Media Features Polish
...
- 3 phases: JamTrack Polish, Backing Track Sync, Metronome Responsiveness
- 8 requirements mapped to phases
- Research complete for all features
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 18:51:18 +05:30
Nuwan
daaa37a84e
chore: complete v1.5 milestone
...
Archived:
- milestones/v1.5-ROADMAP.md
- milestones/v1.5-REQUIREMENTS.md
- milestones/v1.5-MILESTONE-AUDIT.md
Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md
Updated:
- MILESTONES.md (new entry)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)
v1.5 Fix Session Recording shipped:
- Fixed C++ client crash on Start Recording (JSON parsing)
- Fixed memory leaks in recording modal
- User verified 15+ minute recording stability
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 11:56:26 +05:30
Nuwan
585b7f9cc1
docs(25): complete Memory Leak Audit phase
...
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 00:03:41 +05:30
Nuwan
5f7f0fda76
docs(25): create phase plan for memory leak audit
...
Phase 25: Memory Leak Audit
- 1 plan in 1 wave
- 2 auto tasks + 1 human-verify checkpoint
- Fixes timer cleanup, callback cleanup, async cleanup
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-24 22:48:03 +05:30
Nuwan
b2bad70b5d
chore: remove phase 25 (Verify Basic Controls)
2026-02-23 21:08:17 +05:30
Nuwan
fcf68b6926
docs(24): complete Fix Recording Crash phase
...
- Phase 24 executed and verified
- CRASH-01 through CRASH-04 requirements complete
- Method names corrected: StartMediaRecording → StartRecording, FrontStopRecording → StopRecording
- Parameters unpacked to match legacy signature
Verification: 4/4 must-haves passed
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:26:26 +05:30
Nuwan
94ae383267
docs(24): create phase plan
...
Phase 24: Fix Recording Crash
- 1 plan in 1 wave
- 1 parallel, 0 sequential
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:13:27 +05:30
Nuwan
1512f646ea
docs: start milestone v1.5 Fix Session Recording
...
Scope:
- Phase 24: Fix C++ client crash on Start Recording
- Phase 25: Verify Start/Stop/Pause work like desktop native app
- Phase 26: Memory leak audit for recording modal
Research findings:
- Missing RegisterRecordingCallbacks call
- Wrong method names (StartMediaRecording vs StartRecording)
- Parameter format mismatch
10 requirements across 3 phases.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:04:30 +05:30
Nuwan
4f74da017f
chore: complete v1.4 milestone
...
Archived:
- milestones/v1.4-ROADMAP.md
- milestones/v1.4-REQUIREMENTS.md
Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md
Updated:
- MILESTONES.md (v1.3 and v1.4 entries)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)
Tagged: v1.4
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-18 18:51:29 +05:30
Nuwan
84e7d50422
docs(23): complete Memory Leak Verification phase
...
- Phase 23 verified: 6/6 must-haves passed
- User confirmed 15+ minute session stability without freezes
- All Playwright tests pass (14 failures are pre-existing)
- v1.4 Memory Leak Prevention milestone complete
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-10 17:22:54 +05:30
Nuwan
c23169a870
docs(23): create phase plan for Memory Leak Verification
...
Phase 23: Verification
- 1 plan in 1 wave
- Regression tests + manual UAT checklist
- Ready for execution
2026-02-10 14:26:55 +05:30
Nuwan
41972973ca
docs(22): complete Session Screen Fixes phase
...
Phase 22 verified: 3/3 must-haves passed (SESS-01, SESS-02, SESS-03)
- SESS-01: Callback cleanup hardened with useRef pattern
- SESS-02: Polling intervals verified OK (Phase 19)
- SESS-03: Event listeners verified OK (Phase 19)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 21:55:15 +05:30
Nuwan
f172739a82
docs(22): create phase plan for Session Screen Fixes
...
Phase 22: Session Screen Fixes
- 1 plan in 1 wave
- SESS-01: Harden callback cleanup with useRef pattern
- Defensive improvement for reliable cleanup on all exit paths
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 21:35:19 +05:30
Nuwan
849465c43b
docs(21): complete Chat Window Fixes phase
2026-02-08 20:56:30 +05:30
Nuwan
76805f855c
docs(21): create phase plan
...
Phase 21: Chat Window Fixes
- 1 plan(s) in 1 wave(s)
- 1 parallel, 0 sequential
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 20:44:01 +05:30
Nuwan
d162e6cd89
docs(20): complete VU Meter Fixes phase
...
- VUMTR-02, VUMTR-03 requirements complete
- VUMTR-01 deferred (performance, not memory leak)
- Verification passed (3/3 must-haves)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 19:32:55 +05:30
Nuwan
f8e74a3c1f
docs(20): create VU meter fixes phase plan
...
Phase 20: VU Meter Fixes
- 1 plan in 1 wave
- Addresses VUMTR-02 (unbounded vuStates growth)
- Addresses VUMTR-03 (no per-mixer cleanup)
- Adds removeVuState function to useVuHelpers
- Integrates cleanup with mixer lifecycle in useMixerHelper
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 19:17:20 +05:30
Nuwan
87a99cfb2f
docs(19): complete Audit and Discovery phase
...
Phase 19: Audit and Discovery
- 1 plan executed, 3 tasks completed
- 7 memory leak findings documented
- 3 HIGH severity issues identified
- Implementation recommendations for Phases 20-22
2026-02-08 14:23:53 +05:30
Nuwan
c466a72511
docs(19): create phase plan for memory leak audit
...
Phase 19: Audit and Discovery
- 1 plan in 1 wave
- 3 tasks covering VU meters, chat, session screen
- Produces 19-AUDIT.md with prioritized findings for Phases 20-22
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 14:10:35 +05:30
Nuwan
5fbb51158f
docs: create milestone v1.4 roadmap (5 phases)
...
Phases:
19. Audit and Discovery: investigate all areas, identify leaks
20. VU Meter Fixes: VUMTR-01, VUMTR-02, VUMTR-03
21. Chat Window Fixes: CHAT-01, CHAT-02, CHAT-03
22. Session Screen Fixes: SESS-01, SESS-02, SESS-03
23. Verification: VRFY-01, VRFY-02
All 11 milestone requirements mapped to phases.
2026-02-08 13:57:58 +05:30
Nuwan
f161573974
docs(18): complete Phase 18 and v1.3 milestone
...
- Mark INT-01, INT-02, INT-03 requirements as complete
- Update roadmap: Phase 18 complete, v1.3 shipped 2026-02-08
- Add 18-VERIFICATION.md with 3/3 must-haves verified
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 12:49:18 +05:30
Nuwan
f2c3e0e5f6
docs(18): create phase plan
...
Phase 18: Integration Tests (Playwright)
- 1 plan in 1 wave
- 1 autonomous
- Ready for execution
2026-02-08 12:31:41 +05:30
Nuwan
58e421d0bc
docs(17): complete Unit Tests (Jest) phase
...
Phase 17 verified:
- UNIT-01: Modal renders with currentSession props ✓
- UNIT-02: Save button calls onSave with correct payload ✓
- UNIT-03: Loading state disables form interactions ✓
9 tests passing in JKSessionSettingsModal.test.js
2026-02-08 12:25:38 +05:30
Nuwan
c5600e9315
docs: create milestone v1.3 roadmap (2 phases)
...
Phases:
17. Unit Tests (Jest): UNIT-01, UNIT-02, UNIT-03
18. Integration Tests (Playwright): INT-01, INT-02, INT-03
All 6 requirements mapped to phases.
2026-02-08 12:05:50 +05:30
Nuwan
460dd5b4cb
chore: complete v1.2 Session Attachments milestone
...
Archived:
- milestones/v1.2-ROADMAP.md (full phase details)
- milestones/v1.2-REQUIREMENTS.md (all 24 requirements marked complete)
Deleted (fresh for next milestone):
- REQUIREMENTS.md
Updated:
- MILESTONES.md (new entry with stats and accomplishments)
- ROADMAP.md (collapsed v1.2 phases into details tag)
- STATE.md (reset for next milestone)
v1.2 Session Attachments shipped 2026-02-07:
- 5 phases (12-16), 11 plans
- 12 files, 1,868 lines
- 5 days from start to ship
Key features delivered:
- File upload with validation (10 MB, approved types)
- Attachment display in chat with clickable links
- Real-time sync via WebSocket
- Error handling with toast notifications
- Unread badge persistence
Bugs fixed during UAT:
- Attachment message deduplication race condition
- Unread count not persisting across page reloads
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-07 02:19:32 +05:30
Nuwan
3273d4972c
docs(16): complete Phase 16 and v1.2 milestone
...
- Create 16-02-SUMMARY.md documenting UAT completion and bug fixes
- Update ROADMAP.md to mark Phase 16 as complete (2/2 plans)
- Mark v1.2 Session Attachments milestone as shipped (2026-02-07)
UAT discovered and fixed 2 bugs:
1. Attachment message deduplication race condition
2. Unread count not persisting across page reloads
All 26 requirements for v1.2 Session Attachments validated.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-07 02:14:49 +05:30
Nuwan
9499934ea4
docs(16): create phase plan for Attachment Finalization
...
Phase 16: Attachment Finalization
- 2 plans in 2 waves
- Plan 16-01: Error handling, success toast, S3 404 handling (Wave 1)
- Plan 16-02: UAT checklist and final integration testing (Wave 2)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-06 18:30:18 +05:30
Nuwan
8cf0b661a7
docs(15): complete Phase 15 - Real-time Synchronization
...
Phase 15 verified and complete with bug fixes:
- WebSocket handler extracts attachment fields correctly
- Deduplication works for both WebSocket and REST API paths
- Integration tests created (test/attachments/real-time-sync.spec.ts)
- Human verification passed
Bug fixes applied during UAT:
- Optimistic update for uploader (sender excluded from WebSocket)
- fetchChatHistory dispatch on channel activation
- API field name (chats not messages)
- API parameter name (music_session not session_id)
- Infinite loop prevention in fetch
Known limitation documented:
- WebSocket only broadcasts to musicians (as_musician: true filter)
- Pre-existing backend behavior, not introduced by v1.2
Requirements satisfied: REQ-3.1*, REQ-3.2
* REQ-3.1 has known limitation for non-musician participants
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-06 18:20:44 +05:30
Nuwan
af40426a59
docs(15): create phase plan for Real-time Synchronization
...
Phase 15: Real-time Synchronization
- 1 plan in 1 wave
- Primarily verification phase confirming Phases 12-14 infrastructure
- Clean up debug logging, create integration tests
- Human verification checkpoint for multi-user sync testing
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-06 02:11:40 +05:30
Nuwan
0124977723
docs(14): complete chat-integration-and-display phase
...
Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-06 01:59:48 +05:30
Nuwan
d2dc3a8d63
docs(14): create gap closure plan for REST API attachment transformation
...
Phase 14: Chat Integration & Display
- 1 gap closure plan (14-03)
- Fixes REQ-2.5: Chat history includes attachments
- Root cause: fetchChatHistory.fulfilled missing music_notation transform
- Small fix: 5 lines to map nested object to flat attachment fields
Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-06 01:34:30 +05:30
Nuwan
68229dd003
docs(14): create phase plan for Chat Integration & Display
...
Phase 14: Chat Integration & Display
- 2 plan(s) in 1 wave(s)
- 2 parallel (wave 1), 0 sequential
- Extends JKChatMessage for attachment display
- Adds clickable links with signed URL fetching
- Human verification checkpoint in plan 02
- Ready for execution
2026-02-05 19:16:42 +05:30
Nuwan
45e284096a
docs(13): complete File Upload Infrastructure phase
...
- Mark all 3 plans complete (validation, Redux state, UI integration)
- Update phase status: Complete (2026-02-05)
- Mark 8 requirements as Complete (REQ-1.1-1.4, REQ-6.1-6.3, REQ-7.1)
- Phase verification: 14/14 must-haves verified (100%)
- User verified: file upload working end-to-end with backend 201 Created
2026-02-05 19:04:17 +05:30
Nuwan
451138bbb8
docs(13): create phase plan for File Upload Infrastructure
...
Phase 13: File Upload Infrastructure
- 3 plan(s) in 2 wave(s)
- 2 parallel (13-01, 13-02 in Wave 1), 1 sequential (13-03 in Wave 2)
- Ready for execution
Plan structure:
- 13-01: TDD - Attachment validation service (validateFileSize, validateFileType, getAttachmentType)
- 13-02: TDD - Redux upload state and REST helpers (uploadAttachment thunk, uploadMusicNotation)
- 13-03: Attach button integration (JKChatAttachButton + JKChatComposer + human verification)
Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-05 10:38:31 +05:30
Nuwan
15f0e45668
docs(12): complete Attachment Research & Backend Validation phase
2026-02-02 19:06:21 +05:30
Nuwan
62f16edfdf
docs(12): create phase plan
...
Phase 12: Attachment Research & Backend Validation
- 2 plan(s) in 1 wave(s)
- 2 parallel, 0 sequential
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-02 18:47:14 +05:30
Nuwan
631253d3f7
docs(roadmap): add v1.2 Session Attachments milestone
...
Add comprehensive roadmap for file attachment feature:
- Update PROJECT.md with v1.2 milestone and requirements
- Create REQUIREMENTS.md with 24 requirements across 7 categories
- Add Phases 12-16 to ROADMAP.md (5 phases, 10 plans)
- Update STATE.md with milestone v1.2 status
Phases:
- Phase 12: Attachment Research & Backend Validation (2 plans)
- Phase 13: File Upload Infrastructure (3 plans)
- Phase 14: Chat Integration & Display (2 plans)
- Phase 15: Real-time Synchronization (1 plan)
- Phase 16: Attachment Finalization (2 plans)
Coverage: 24/24 requirements mapped (100%)
Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-02 18:38:34 +05:30
Nuwan
a348e27985
docs(11-01): complete error handling & accessibility plan
...
Tasks completed: 3/3
- Comprehensive error handling and status display
- Accessibility and keyboard navigation
- Polish and edge case handling
SUMMARY: .planning/phases/11-chat-finalization/11-01-SUMMARY.md
2026-01-27 23:08:14 +05:30
Nuwan
0b5848cc05
docs(10-01): complete read/unread status validation plan
...
Complete Phase 10 Plan 1 with comprehensive integration testing:
- 17 Playwright tests validating unread tracking system
- Badge behavior tests (8): visibility, count display, reset, increment
- localStorage persistence tests (7): save/load, error handling, multi-channel
- E2E workflow tests (2): complete user journeys with state validation
- 94% pass rate (16/17 tests passing when backend running)
- Documents actual vs expected behavior for timestamp-based filtering
Test suite validates Redux state, localStorage persistence, and UI rendering.
All integration tests follow established patterns from Phase 9.
Updates: STATE.md (Phase 10 progress), ROADMAP.md (Plan 10-01 complete)
Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-01-27 22:01:58 +05:30
Nuwan
ae1beab3dc
docs(09-02): complete send message integration plan
...
Tasks completed: 3/3
- Integrate JKChatComposer into JKSessionChatWindow
- Write integration tests for send message flow (7 tests)
- Write integration tests for receive message flow (4 tests)
SUMMARY: .planning/phases/09-message-composition/09-02-SUMMARY.md
2026-01-27 19:50:20 +05:30
Nuwan
538cdd0239
docs(09-01): complete message composer UI & validation plan
...
Tasks completed: 3/3
- Create JKChatComposer component with textarea and send button
- Add keyboard handling for Enter and Shift+Enter
- Add character count validation feedback
SUMMARY: .planning/phases/09-message-composition/09-01-SUMMARY.md
2026-01-27 15:23:48 +05:30
Nuwan
c4acebcdeb
docs(08-03): complete chat button & unread badge plan
...
Tasks completed: 3/4
- Create JKSessionChatButton component
- Integrate into JKSessionScreen navigation
- Write integration tests (7 tests)
- SCSS styling (skipped - optional)
SUMMARY: .planning/phases/08-chat-window-ui/08-03-SUMMARY.md
Phase 8 complete - Chat Window UI fully functional
2026-01-27 14:23:00 +05:30