Nuwan 393bdfe057 docs(28): complete VU Meter Optimization phase
Phase 28 verified and approved:
- VU data flows through external store (vuStore.js)
- VU components use refs for direct DOM updates
- React DevTools shows 0 re-renders from VU updates
- Session screen remains responsive

Requirements satisfied: VU-01, VU-02, VU-03

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-05 16:53:43 +05:30
Nuwan 9c9e118a6e docs(28): create phase plan
Phase 28: VU Meter Optimization
- 2 plan(s) in 2 wave(s)
- 1 parallel (wave 1), 1 sequential (wave 2)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 20:09:26 +05:30
Nuwan 9174d161c6 docs: start milestone v1.7 Performance Optimization
Goals:
- Eliminate page freezes from excessive React re-renders
- Optimize VU meter updates (50-70/sec → batched RAF)
- Prevent cascading re-renders with memoization
- Apply React best practices for granular updates

Phases:
28. VU Meter Optimization
29. Context Optimization
30. Component Memoization
31. Selector Optimization
32. State Update Optimization

19 requirements across 5 phases.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 19:57:32 +05:30
Nuwan 4c4ee9253b chore: complete v1.6 milestone
Archived:
- milestones/v1.6-ROADMAP.md
- milestones/v1.6-REQUIREMENTS.md

Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md

Updated:
- MILESTONES.md (new entry)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)

v1.6 Media Features Polish shipped:
- JamTrack loading sequence, sizing, navigation fixed
- Backing track sync to session screen
- Prevent multiple media players simultaneously
- 2 phases, 5 plans, 7 days

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 16:33:44 +05:30
Nuwan 51f7cb105a docs(v1.6): descope Phase 28 - metronome responsiveness satisfactory
Removed Phase 28 (Metronome Responsiveness) from v1.6 milestone.
Metronome responsiveness is satisfactory after Phase 26-27 improvements.

MET-01, MET-02 requirements moved to Out of Scope.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 16:31:17 +05:30
Nuwan e35163ec84 docs(27): complete Backing Track Sync phase
- Phase 27 verified: 2/2 must-haves confirmed
- BT-01: openBackingTrack action enables session screen sync
- BT-02: ignore flag prevents unmount warnings
- ROADMAP.md, STATE.md, REQUIREMENTS.md updated

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-26 17:25:08 +05:30
Nuwan c7f6480137 docs(27): create phase plan for backing track sync
Phase 27: Backing Track Sync
- 1 plan in 1 wave
- 2 tasks (both auto)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-26 16:55:35 +05:30
Nuwan e4300aecb4 docs(26): complete JamTrack Polish phase with gap closure round 2 2026-02-25 23:51:01 +05:30
Nuwan 6423df4b7b docs(26): complete JamTrack Polish phase with gap closure 2026-02-25 23:24:34 +05:30
Nuwan 41463c9863 docs(26): create gap closure plan for stems/controls render timing
Phase 26: JamTrack Polish
- Plan 26-03 removes 'idle' from valid render states
- Closes UAT gap: stems/controls appearing before sync
- 1 plan in wave 3, depends on 26-02

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 22:59:46 +05:30
Nuwan 634d86f43b docs(26): complete JamTrack Polish phase
- Phase 26 verified: 4/4 must-haves passed
- Requirements JT-01 through JT-04 complete
- Ready for Phase 27 (Backing Track Sync)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 19:18:41 +05:30
Nuwan 48c9bf8313 docs(26): create phase plan for JamTrack Polish
Phase 26: JamTrack Polish
- 2 plan(s) in 2 wave(s)
- Wave 1: 26-01 (UI fixes - sizing, navigation)
- Wave 2: 26-02 (state/callback fixes - cleanup, deferred rendering)
- Ready for execution

Requirements covered:
- JT-01: Defer UI rendering until track ready
- JT-02: Fix WindowPortal sizing (460x350)
- JT-03: Implement create custom mix navigation
- JT-04: Add callback cleanup for jamTrackDownload* globals

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 19:05:14 +05:30
Nuwan eab0b0d19a docs(v1.6): create roadmap for Media Features Polish
- 3 phases: JamTrack Polish, Backing Track Sync, Metronome Responsiveness
- 8 requirements mapped to phases
- Research complete for all features

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 18:51:18 +05:30
Nuwan daaa37a84e chore: complete v1.5 milestone
Archived:
- milestones/v1.5-ROADMAP.md
- milestones/v1.5-REQUIREMENTS.md
- milestones/v1.5-MILESTONE-AUDIT.md

Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md

Updated:
- MILESTONES.md (new entry)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)

v1.5 Fix Session Recording shipped:
- Fixed C++ client crash on Start Recording (JSON parsing)
- Fixed memory leaks in recording modal
- User verified 15+ minute recording stability

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 11:56:26 +05:30
Nuwan 585b7f9cc1 docs(25): complete Memory Leak Audit phase
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 00:03:41 +05:30
Nuwan 5f7f0fda76 docs(25): create phase plan for memory leak audit
Phase 25: Memory Leak Audit
- 1 plan in 1 wave
- 2 auto tasks + 1 human-verify checkpoint
- Fixes timer cleanup, callback cleanup, async cleanup
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-24 22:48:03 +05:30
Nuwan b2bad70b5d chore: remove phase 25 (Verify Basic Controls) 2026-02-23 21:08:17 +05:30
Nuwan fcf68b6926 docs(24): complete Fix Recording Crash phase
- Phase 24 executed and verified
- CRASH-01 through CRASH-04 requirements complete
- Method names corrected: StartMediaRecording → StartRecording, FrontStopRecording → StopRecording
- Parameters unpacked to match legacy signature

Verification: 4/4 must-haves passed

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:26:26 +05:30
Nuwan 94ae383267 docs(24): create phase plan
Phase 24: Fix Recording Crash
- 1 plan in 1 wave
- 1 parallel, 0 sequential
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:13:27 +05:30
Nuwan 1512f646ea docs: start milestone v1.5 Fix Session Recording
Scope:
- Phase 24: Fix C++ client crash on Start Recording
- Phase 25: Verify Start/Stop/Pause work like desktop native app
- Phase 26: Memory leak audit for recording modal

Research findings:
- Missing RegisterRecordingCallbacks call
- Wrong method names (StartMediaRecording vs StartRecording)
- Parameter format mismatch

10 requirements across 3 phases.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:04:30 +05:30
Nuwan 4f74da017f chore: complete v1.4 milestone
Archived:
- milestones/v1.4-ROADMAP.md
- milestones/v1.4-REQUIREMENTS.md

Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md

Updated:
- MILESTONES.md (v1.3 and v1.4 entries)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)

Tagged: v1.4

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-18 18:51:29 +05:30
Nuwan 84e7d50422 docs(23): complete Memory Leak Verification phase
- Phase 23 verified: 6/6 must-haves passed
- User confirmed 15+ minute session stability without freezes
- All Playwright tests pass (14 failures are pre-existing)
- v1.4 Memory Leak Prevention milestone complete

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-10 17:22:54 +05:30
Nuwan c23169a870 docs(23): create phase plan for Memory Leak Verification
Phase 23: Verification
- 1 plan in 1 wave
- Regression tests + manual UAT checklist
- Ready for execution
2026-02-10 14:26:55 +05:30
Nuwan 41972973ca docs(22): complete Session Screen Fixes phase
Phase 22 verified: 3/3 must-haves passed (SESS-01, SESS-02, SESS-03)
- SESS-01: Callback cleanup hardened with useRef pattern
- SESS-02: Polling intervals verified OK (Phase 19)
- SESS-03: Event listeners verified OK (Phase 19)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 21:55:15 +05:30
Nuwan f172739a82 docs(22): create phase plan for Session Screen Fixes
Phase 22: Session Screen Fixes
- 1 plan in 1 wave
- SESS-01: Harden callback cleanup with useRef pattern
- Defensive improvement for reliable cleanup on all exit paths

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 21:35:19 +05:30
Nuwan 849465c43b docs(21): complete Chat Window Fixes phase 2026-02-08 20:56:30 +05:30
Nuwan 76805f855c docs(21): create phase plan
Phase 21: Chat Window Fixes
- 1 plan(s) in 1 wave(s)
- 1 parallel, 0 sequential
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 20:44:01 +05:30
Nuwan d162e6cd89 docs(20): complete VU Meter Fixes phase
- VUMTR-02, VUMTR-03 requirements complete
- VUMTR-01 deferred (performance, not memory leak)
- Verification passed (3/3 must-haves)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 19:32:55 +05:30
Nuwan f8e74a3c1f docs(20): create VU meter fixes phase plan
Phase 20: VU Meter Fixes
- 1 plan in 1 wave
- Addresses VUMTR-02 (unbounded vuStates growth)
- Addresses VUMTR-03 (no per-mixer cleanup)
- Adds removeVuState function to useVuHelpers
- Integrates cleanup with mixer lifecycle in useMixerHelper
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 19:17:20 +05:30
Nuwan 87a99cfb2f docs(19): complete Audit and Discovery phase
Phase 19: Audit and Discovery
- 1 plan executed, 3 tasks completed
- 7 memory leak findings documented
- 3 HIGH severity issues identified
- Implementation recommendations for Phases 20-22
2026-02-08 14:23:53 +05:30
Nuwan c466a72511 docs(19): create phase plan for memory leak audit
Phase 19: Audit and Discovery
- 1 plan in 1 wave
- 3 tasks covering VU meters, chat, session screen
- Produces 19-AUDIT.md with prioritized findings for Phases 20-22

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 14:10:35 +05:30
Nuwan 5fbb51158f docs: create milestone v1.4 roadmap (5 phases)
Phases:
19. Audit and Discovery: investigate all areas, identify leaks
20. VU Meter Fixes: VUMTR-01, VUMTR-02, VUMTR-03
21. Chat Window Fixes: CHAT-01, CHAT-02, CHAT-03
22. Session Screen Fixes: SESS-01, SESS-02, SESS-03
23. Verification: VRFY-01, VRFY-02

All 11 milestone requirements mapped to phases.
2026-02-08 13:57:58 +05:30
Nuwan f161573974 docs(18): complete Phase 18 and v1.3 milestone
- Mark INT-01, INT-02, INT-03 requirements as complete
- Update roadmap: Phase 18 complete, v1.3 shipped 2026-02-08
- Add 18-VERIFICATION.md with 3/3 must-haves verified

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-08 12:49:18 +05:30
Nuwan f2c3e0e5f6 docs(18): create phase plan
Phase 18: Integration Tests (Playwright)
- 1 plan in 1 wave
- 1 autonomous
- Ready for execution
2026-02-08 12:31:41 +05:30
Nuwan 58e421d0bc docs(17): complete Unit Tests (Jest) phase
Phase 17 verified:
- UNIT-01: Modal renders with currentSession props ✓
- UNIT-02: Save button calls onSave with correct payload ✓
- UNIT-03: Loading state disables form interactions ✓

9 tests passing in JKSessionSettingsModal.test.js
2026-02-08 12:25:38 +05:30
Nuwan c5600e9315 docs: create milestone v1.3 roadmap (2 phases)
Phases:
17. Unit Tests (Jest): UNIT-01, UNIT-02, UNIT-03
18. Integration Tests (Playwright): INT-01, INT-02, INT-03

All 6 requirements mapped to phases.
2026-02-08 12:05:50 +05:30
Nuwan 460dd5b4cb chore: complete v1.2 Session Attachments milestone
Archived:
- milestones/v1.2-ROADMAP.md (full phase details)
- milestones/v1.2-REQUIREMENTS.md (all 24 requirements marked complete)

Deleted (fresh for next milestone):
- REQUIREMENTS.md

Updated:
- MILESTONES.md (new entry with stats and accomplishments)
- ROADMAP.md (collapsed v1.2 phases into details tag)
- STATE.md (reset for next milestone)

v1.2 Session Attachments shipped 2026-02-07:
- 5 phases (12-16), 11 plans
- 12 files, 1,868 lines
- 5 days from start to ship

Key features delivered:
- File upload with validation (10 MB, approved types)
- Attachment display in chat with clickable links
- Real-time sync via WebSocket
- Error handling with toast notifications
- Unread badge persistence

Bugs fixed during UAT:
- Attachment message deduplication race condition
- Unread count not persisting across page reloads

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-07 02:19:32 +05:30
Nuwan 3273d4972c docs(16): complete Phase 16 and v1.2 milestone
- Create 16-02-SUMMARY.md documenting UAT completion and bug fixes
- Update ROADMAP.md to mark Phase 16 as complete (2/2 plans)
- Mark v1.2 Session Attachments milestone as shipped (2026-02-07)

UAT discovered and fixed 2 bugs:
1. Attachment message deduplication race condition
2. Unread count not persisting across page reloads

All 26 requirements for v1.2 Session Attachments validated.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-07 02:14:49 +05:30
Nuwan 9499934ea4 docs(16): create phase plan for Attachment Finalization
Phase 16: Attachment Finalization
- 2 plans in 2 waves
- Plan 16-01: Error handling, success toast, S3 404 handling (Wave 1)
- Plan 16-02: UAT checklist and final integration testing (Wave 2)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-06 18:30:18 +05:30
Nuwan 8cf0b661a7 docs(15): complete Phase 15 - Real-time Synchronization
Phase 15 verified and complete with bug fixes:
- WebSocket handler extracts attachment fields correctly
- Deduplication works for both WebSocket and REST API paths
- Integration tests created (test/attachments/real-time-sync.spec.ts)
- Human verification passed

Bug fixes applied during UAT:
- Optimistic update for uploader (sender excluded from WebSocket)
- fetchChatHistory dispatch on channel activation
- API field name (chats not messages)
- API parameter name (music_session not session_id)
- Infinite loop prevention in fetch

Known limitation documented:
- WebSocket only broadcasts to musicians (as_musician: true filter)
- Pre-existing backend behavior, not introduced by v1.2

Requirements satisfied: REQ-3.1*, REQ-3.2
* REQ-3.1 has known limitation for non-musician participants

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-06 18:20:44 +05:30
Nuwan af40426a59 docs(15): create phase plan for Real-time Synchronization
Phase 15: Real-time Synchronization
- 1 plan in 1 wave
- Primarily verification phase confirming Phases 12-14 infrastructure
- Clean up debug logging, create integration tests
- Human verification checkpoint for multi-user sync testing

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-06 02:11:40 +05:30
Nuwan 0124977723 docs(14): complete chat-integration-and-display phase
Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-06 01:59:48 +05:30
Nuwan d2dc3a8d63 docs(14): create gap closure plan for REST API attachment transformation
Phase 14: Chat Integration & Display
- 1 gap closure plan (14-03)
- Fixes REQ-2.5: Chat history includes attachments
- Root cause: fetchChatHistory.fulfilled missing music_notation transform
- Small fix: 5 lines to map nested object to flat attachment fields

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-06 01:34:30 +05:30
Nuwan 68229dd003 docs(14): create phase plan for Chat Integration & Display
Phase 14: Chat Integration & Display
- 2 plan(s) in 1 wave(s)
- 2 parallel (wave 1), 0 sequential
- Extends JKChatMessage for attachment display
- Adds clickable links with signed URL fetching
- Human verification checkpoint in plan 02
- Ready for execution
2026-02-05 19:16:42 +05:30
Nuwan 45e284096a docs(13): complete File Upload Infrastructure phase
- Mark all 3 plans complete (validation, Redux state, UI integration)
- Update phase status: Complete (2026-02-05)
- Mark 8 requirements as Complete (REQ-1.1-1.4, REQ-6.1-6.3, REQ-7.1)
- Phase verification: 14/14 must-haves verified (100%)
- User verified: file upload working end-to-end with backend 201 Created
2026-02-05 19:04:17 +05:30
Nuwan 451138bbb8 docs(13): create phase plan for File Upload Infrastructure
Phase 13: File Upload Infrastructure
- 3 plan(s) in 2 wave(s)
- 2 parallel (13-01, 13-02 in Wave 1), 1 sequential (13-03 in Wave 2)
- Ready for execution

Plan structure:
- 13-01: TDD - Attachment validation service (validateFileSize, validateFileType, getAttachmentType)
- 13-02: TDD - Redux upload state and REST helpers (uploadAttachment thunk, uploadMusicNotation)
- 13-03: Attach button integration (JKChatAttachButton + JKChatComposer + human verification)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-05 10:38:31 +05:30
Nuwan 15f0e45668 docs(12): complete Attachment Research & Backend Validation phase 2026-02-02 19:06:21 +05:30
Nuwan 62f16edfdf docs(12): create phase plan
Phase 12: Attachment Research & Backend Validation
- 2 plan(s) in 1 wave(s)
- 2 parallel, 0 sequential
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-02 18:47:14 +05:30
Nuwan 631253d3f7 docs(roadmap): add v1.2 Session Attachments milestone
Add comprehensive roadmap for file attachment feature:
- Update PROJECT.md with v1.2 milestone and requirements
- Create REQUIREMENTS.md with 24 requirements across 7 categories
- Add Phases 12-16 to ROADMAP.md (5 phases, 10 plans)
- Update STATE.md with milestone v1.2 status

Phases:
- Phase 12: Attachment Research & Backend Validation (2 plans)
- Phase 13: File Upload Infrastructure (3 plans)
- Phase 14: Chat Integration & Display (2 plans)
- Phase 15: Real-time Synchronization (1 plan)
- Phase 16: Attachment Finalization (2 plans)

Coverage: 24/24 requirements mapped (100%)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-02 18:38:34 +05:30
Nuwan a348e27985 docs(11-01): complete error handling & accessibility plan
Tasks completed: 3/3
- Comprehensive error handling and status display
- Accessibility and keyboard navigation
- Polish and edge case handling

SUMMARY: .planning/phases/11-chat-finalization/11-01-SUMMARY.md
2026-01-27 23:08:14 +05:30