Commit Graph

188 Commits

Author SHA1 Message Date
Nuwan 125a7cdcc2 docs(30): research component memoization phase domain
Phase 30: Component Memoization
- React.memo API and patterns for React 16.13.1
- Prop stability requirements documented
- Integration with Phase 29 context memoization
- Common pitfalls: inline props, children, context
- Verification with React DevTools Profiler
- DisplayName for debugging best practices

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-05 18:25:04 +05:30
Nuwan af1c06302a docs(29): complete Context Optimization phase
Phase 29 verified and complete:
- MixersContext.Provider value memoized with useMemo
- VuContext separated from MixerConfigContext (Phase 28)
- 6 context consumers wrapped with React.memo
- useMixerHelper.getMixer stabilized with useCallback

Requirements satisfied: CTX-01, CTX-02, CTX-03

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-05 17:59:02 +05:30
Nuwan db1033a5c6 docs(29-01): complete context optimization plan 01
Tasks completed: 4/4
- Task 1a: Stabilize useMixerHelper function references
- Task 1b: Memoize MixersContext provider value
- Task 2: Memoize VuContext and GlobalContext provider values
- Task 3: Wrap context consumers with React.memo

SUMMARY: .planning/phases/29-context-optimization/29-01-SUMMARY.md

Accomplishments:
- Memoized all 3 context providers (MixersContext, VuContext, GlobalContext)
- Stabilized getMixer and dependent function references
- Wrapped 6 consumer components with React.memo
- Eliminated cascading re-renders from context value changes

Requirements completed:
- CTX-00: useMixerHelper.getMixer wrapped with useCallback
- CTX-01: MixersContext.Provider value is memoized
- CTX-03: Context consumers only re-render when data changes

Performance impact:
- Volume slider changes no longer re-render VU meters
- VU updates no longer re-render volume sliders
- Context consumers only re-render when their specific data changes
2026-03-05 17:54:56 +05:30
Nuwan 468860d54f fix(29): revise plan based on checker feedback
- Split Task 1 into Task 1a (stabilize useMixerHelper) and Task 1b (memoize MixersContext)
- Add useMixerHelper.js to files_modified
- Add getMixer useCallback wrapping as prerequisite for context memoization
- Add key_link verifying useMixerHelper -> MixersContext wiring
- Add CTX-00 success criterion for getMixer stabilization

Issues addressed:
- task_completeness: Task 1 now includes getMixer useCallback wrapping
- key_links_planned: Added verification for useMixerHelper stabilization
2026-03-05 17:22:30 +05:30
Nuwan c595d5334e docs(29): create phase plan
Phase 29: Context Optimization
- 1 plan in 1 wave
- Memoize MixersContext, VuContext, GlobalContext providers
- Wrap 6 consumer components with React.memo
- Ready for execution
2026-03-05 17:18:20 +05:30
Nuwan ceec2342fe docs(29): research context optimization phase domain
Phase 29: Context Optimization
- Standard stack identified (useMemo, useCallback, memo built-ins)
- Architecture patterns documented (memoized provider values)
- Pitfalls catalogued (stale closures, missing dependencies)
2026-03-05 17:15:44 +05:30
Nuwan 393bdfe057 docs(28): complete VU Meter Optimization phase
Phase 28 verified and approved:
- VU data flows through external store (vuStore.js)
- VU components use refs for direct DOM updates
- React DevTools shows 0 re-renders from VU updates
- Session screen remains responsive

Requirements satisfied: VU-01, VU-02, VU-03

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-05 16:53:43 +05:30
Nuwan 6b6aeb1017 docs(28-02): complete Wire Components to External Store plan
Tasks completed: 4/4
- Update useMixerStore to route VU data to external store
- Simplify useVuHelpers and VuContext
- Rewrite SessionTrackVU with direct DOM updates
- Human verification (approved)

Additional fix:
- getLevelSnapshot now checks pendingUpdates for immediate access

SUMMARY: .planning/phases/28-vu-meter-optimization/28-02-SUMMARY.md
2026-03-05 15:18:31 +05:30
Nuwan 344ef27ae0 docs(28-01): complete External VU Store Infrastructure plan
Tasks completed: 2/2
- Install useSyncExternalStore shim and create external VU store
- Create useVuStore React hooks

SUMMARY: .planning/phases/28-vu-meter-optimization/28-01-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 20:22:13 +05:30
Nuwan 9c9e118a6e docs(28): create phase plan
Phase 28: VU Meter Optimization
- 2 plan(s) in 2 wave(s)
- 1 parallel (wave 1), 1 sequential (wave 2)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 20:09:26 +05:30
Nuwan e8c5a213c6 docs(28): research VU meter optimization phase domain
Phase 28: VU Meter Optimization
- Standard stack identified (use-sync-external-store shim, requestAnimationFrame)
- Architecture patterns documented (external store, direct DOM updates with refs)
- Pitfalls catalogued (getSnapshot object creation, rAF cleanup, layout thrashing)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 20:05:08 +05:30
Nuwan 9174d161c6 docs: start milestone v1.7 Performance Optimization
Goals:
- Eliminate page freezes from excessive React re-renders
- Optimize VU meter updates (50-70/sec → batched RAF)
- Prevent cascading re-renders with memoization
- Apply React best practices for granular updates

Phases:
28. VU Meter Optimization
29. Context Optimization
30. Component Memoization
31. Selector Optimization
32. State Update Optimization

19 requirements across 5 phases.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 19:57:32 +05:30
Nuwan 4c4ee9253b chore: complete v1.6 milestone
Archived:
- milestones/v1.6-ROADMAP.md
- milestones/v1.6-REQUIREMENTS.md

Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md

Updated:
- MILESTONES.md (new entry)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)

v1.6 Media Features Polish shipped:
- JamTrack loading sequence, sizing, navigation fixed
- Backing track sync to session screen
- Prevent multiple media players simultaneously
- 2 phases, 5 plans, 7 days

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 16:33:44 +05:30
Nuwan 51f7cb105a docs(v1.6): descope Phase 28 - metronome responsiveness satisfactory
Removed Phase 28 (Metronome Responsiveness) from v1.6 milestone.
Metronome responsiveness is satisfactory after Phase 26-27 improvements.

MET-01, MET-02 requirements moved to Out of Scope.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-03 16:31:17 +05:30
Nuwan 3da5f8938e docs(27): add debug notes and verification documentation
- Add jamtrack stems debug notes
- Add phase 26 verification v2 documentation

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-03-02 19:04:42 +05:30
Nuwan e35163ec84 docs(27): complete Backing Track Sync phase
- Phase 27 verified: 2/2 must-haves confirmed
- BT-01: openBackingTrack action enables session screen sync
- BT-02: ignore flag prevents unmount warnings
- ROADMAP.md, STATE.md, REQUIREMENTS.md updated

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-26 17:25:08 +05:30
Nuwan 748e01f60a docs(27-01): complete backing track sync plan
Tasks completed: 2/2
- Use openBackingTrack action in handleBackingTrackSelected
- Add ignore flag to duration fetch useEffect

SUMMARY: .planning/phases/27-backing-track-sync/27-01-SUMMARY.md
2026-02-26 17:21:22 +05:30
Nuwan c7f6480137 docs(27): create phase plan for backing track sync
Phase 27: Backing Track Sync
- 1 plan in 1 wave
- 2 tasks (both auto)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-26 16:55:35 +05:30
Nuwan 12ce12420f docs(27): research backing track sync domain
Phase 27: Backing Track Sync
- Standard stack identified (existing React/Redux patterns)
- Architecture patterns documented (openBackingTrack action, ignore flag)
- Pitfalls catalogued (bypassing Redux, race conditions)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-26 16:53:05 +05:30
Nuwan e4300aecb4 docs(26): complete JamTrack Polish phase with gap closure round 2 2026-02-25 23:51:01 +05:30
Nuwan 5a7f29e3e6 fix(26): orchestrator corrections - update planning docs 2026-02-25 23:47:07 +05:30
Nuwan 38aacb49a5 docs(26-04): complete trigger download flow plan
Tasks completed: 2/2
- Task 1: Call loadJamTrack when track is not synchronized
- Task 2: Build verification (syntax validated via Babel parser)

SUMMARY: .planning/phases/26-jamtrack-polish/26-04-SUMMARY.md
2026-02-25 23:46:46 +05:30
Nuwan 6423df4b7b docs(26): complete JamTrack Polish phase with gap closure 2026-02-25 23:24:34 +05:30
Nuwan 4e5192d52f docs(26-03): complete JamTrack stems/controls render timing fix
Tasks completed: 4/4
- Task 1: Call checkJamTrackSync in handleJamTrackSelect
- Task 2: Remove 'idle' from stems render condition
- Task 3: Remove 'idle' from controls render condition
- Task 4: Build verification

SUMMARY: .planning/phases/26-jamtrack-polish/26-03-SUMMARY.md
2026-02-25 23:17:32 +05:30
Nuwan 41463c9863 docs(26): create gap closure plan for stems/controls render timing
Phase 26: JamTrack Polish
- Plan 26-03 removes 'idle' from valid render states
- Closes UAT gap: stems/controls appearing before sync
- 1 plan in wave 3, depends on 26-02

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 22:59:46 +05:30
Nuwan 156b1039e8 test(26): complete UAT - 3 passed, 1 issue
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 22:53:41 +05:30
Nuwan 634d86f43b docs(26): complete JamTrack Polish phase
- Phase 26 verified: 4/4 must-haves passed
- Requirements JT-01 through JT-04 complete
- Ready for Phase 27 (Backing Track Sync)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 19:18:41 +05:30
Nuwan f46c0ebc01 docs(26): update PROJECT.md for v1.6 milestone
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 19:15:42 +05:30
Nuwan 00b912f801 docs(26-02): complete JamTrack callback cleanup plan
Tasks completed: 3/3
- Add callback cleanup action to mediaSlice
- Call cleanup on unmount and defer controls rendering
- Build verification

SUMMARY: .planning/phases/26-jamtrack-polish/26-02-SUMMARY.md
2026-02-25 19:15:12 +05:30
Nuwan 2314c29b9e docs(26-01): complete JamTrack player fixes plan
Tasks completed: 2/2
- Fix WindowPortal sizing for JamTrack player
- Implement create custom mix navigation

SUMMARY: .planning/phases/26-jamtrack-polish/26-01-SUMMARY.md
2026-02-25 19:11:29 +05:30
Nuwan 48c9bf8313 docs(26): create phase plan for JamTrack Polish
Phase 26: JamTrack Polish
- 2 plan(s) in 2 wave(s)
- Wave 1: 26-01 (UI fixes - sizing, navigation)
- Wave 2: 26-02 (state/callback fixes - cleanup, deferred rendering)
- Ready for execution

Requirements covered:
- JT-01: Defer UI rendering until track ready
- JT-02: Fix WindowPortal sizing (460x350)
- JT-03: Implement create custom mix navigation
- JT-04: Add callback cleanup for jamTrackDownload* globals

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 19:05:14 +05:30
Nuwan eab0b0d19a docs(v1.6): create roadmap for Media Features Polish
- 3 phases: JamTrack Polish, Backing Track Sync, Metronome Responsiveness
- 8 requirements mapped to phases
- Research complete for all features

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 18:51:18 +05:30
Nuwan daaa37a84e chore: complete v1.5 milestone
Archived:
- milestones/v1.5-ROADMAP.md
- milestones/v1.5-REQUIREMENTS.md
- milestones/v1.5-MILESTONE-AUDIT.md

Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md

Updated:
- MILESTONES.md (new entry)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)

v1.5 Fix Session Recording shipped:
- Fixed C++ client crash on Start Recording (JSON parsing)
- Fixed memory leaks in recording modal
- User verified 15+ minute recording stability

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 11:56:26 +05:30
Nuwan 2292cb4fd6 docs: audit v1.5 milestone before completion
Findings:
- Recording crash fixed (JSON parsing, not method names)
- Memory leaks fixed (timer/callback/async cleanup)
- Tech debt: 24-VERIFICATION.md describes reverted code
- Tech debt: CTRL requirements unmapped in roadmap

Status: tech_debt (shippable, documentation inconsistencies)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 00:31:58 +05:30
Nuwan 585b7f9cc1 docs(25): complete Memory Leak Audit phase
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-25 00:03:41 +05:30
Nuwan af71f8e500 docs(25-01): complete memory leak audit plan
Tasks completed: 4/4
- Fix timer and callback cleanup in useRecordingHelpers
- Fix async cleanup in JKSessionRecordingModal
- Create UAT checklist for memory verification
- Verify memory stability with UAT checklist (user approved)

SUMMARY: .planning/phases/25-memory-leak-audit/25-01-SUMMARY.md
2026-02-24 23:59:52 +05:30
Nuwan 32ee0e8b10 docs(25-01): create UAT checklist for recording memory verification
- 5 comprehensive test sections covering all memory leak scenarios
- Timer cleanup verification test
- Callback accumulation verification test
- Async operation cleanup verification test
- 15-minute modal idle stability test
- 15-minute active recording stability test
- Troubleshooting guide for each failure type
2026-02-24 23:20:38 +05:30
Nuwan 445e4834a6 fix(25): revise plan based on checker feedback
- Added Task 3 to create 25-UAT.md (requirement_coverage blocker)
- Renumbered checkpoint task from 3 to 4
- Simplified key_links[0] pattern to 'delete window\.JK' (warning fix)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-24 22:51:29 +05:30
Nuwan 5f7f0fda76 docs(25): create phase plan for memory leak audit
Phase 25: Memory Leak Audit
- 1 plan in 1 wave
- 2 auto tasks + 1 human-verify checkpoint
- Fixes timer cleanup, callback cleanup, async cleanup
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-24 22:48:03 +05:30
Nuwan 59f36edd93 docs(25): research memory leak audit domain
Phase 25: Memory Leak Audit
- Identified 4 memory leak issues in recording code
- Documented cleanup patterns (useRef, ignore flag, timer cleanup)
- Created verification method following Phase 23 approach
- Confidence: HIGH based on React docs and codebase analysis

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-24 22:44:50 +05:30
Nuwan 677732996f docs(25): capture phase context
Phase 25: Memory Leak Audit
- Implementation decisions documented
- Phase boundary established
2026-02-24 22:32:31 +05:30
Nuwan b2bad70b5d chore: remove phase 25 (Verify Basic Controls) 2026-02-23 21:08:17 +05:30
Nuwan fcf68b6926 docs(24): complete Fix Recording Crash phase
- Phase 24 executed and verified
- CRASH-01 through CRASH-04 requirements complete
- Method names corrected: StartMediaRecording → StartRecording, FrontStopRecording → StopRecording
- Parameters unpacked to match legacy signature

Verification: 4/4 must-haves passed

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:26:26 +05:30
Nuwan e50845dcd1 docs(24-01): complete Fix Recording Crash plan
Tasks completed: 2/2
- Fix useRecordingHelpers.js method names and parameters
- Fix JKSessionScreen.js doStartRecording method

SUMMARY: .planning/phases/24-fix-recording-crash/24-01-SUMMARY.md
2026-02-19 15:22:55 +05:30
Nuwan 94ae383267 docs(24): create phase plan
Phase 24: Fix Recording Crash
- 1 plan in 1 wave
- 1 parallel, 0 sequential
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:13:27 +05:30
Nuwan 1512f646ea docs: start milestone v1.5 Fix Session Recording
Scope:
- Phase 24: Fix C++ client crash on Start Recording
- Phase 25: Verify Start/Stop/Pause work like desktop native app
- Phase 26: Memory leak audit for recording modal

Research findings:
- Missing RegisterRecordingCallbacks call
- Wrong method names (StartMediaRecording vs StartRecording)
- Parameter format mismatch

10 requirements across 3 phases.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-19 15:04:30 +05:30
Nuwan 4f74da017f chore: complete v1.4 milestone
Archived:
- milestones/v1.4-ROADMAP.md
- milestones/v1.4-REQUIREMENTS.md

Deleted (fresh for next milestone):
- ROADMAP.md
- REQUIREMENTS.md

Updated:
- MILESTONES.md (v1.3 and v1.4 entries)
- PROJECT.md (requirements → Validated)
- STATE.md (reset for next milestone)

Tagged: v1.4

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-18 18:51:29 +05:30
Nuwan 84e7d50422 docs(23): complete Memory Leak Verification phase
- Phase 23 verified: 6/6 must-haves passed
- User confirmed 15+ minute session stability without freezes
- All Playwright tests pass (14 failures are pre-existing)
- v1.4 Memory Leak Prevention milestone complete

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-10 17:22:54 +05:30
Nuwan 895b283f30 docs(23-01): complete Memory Leak Verification plan
Tasks completed: 3/3
- Task 1: Run Playwright regression tests (36 pass, 14 pre-existing failures)
- Task 2: Create UAT checklist for memory verification
- Task 3: Execute manual memory verification (user approved)

v1.4 Memory Leak Prevention milestone complete.
User verified 15+ minute session stability with no freezes.

SUMMARY: .planning/phases/23-verification/23-01-SUMMARY.md
2026-02-10 17:19:04 +05:30
Nuwan bea0fd6df8 docs(23-01): mark UAT verification as passed
- User verified 15+ minute session stability
- No freezes or performance bottlenecks observed
- All memory leak fixes from Phases 20-22 confirmed working
2026-02-10 17:17:54 +05:30